Five scopes, and why they stay apart
A climb is a rigging problem. A modification is a structural problem. A generator is an electrical problem. They are engineered, crewed, priced and documented differently, so each one has its own page rather than a shared paragraph.
New self-support, monopole and guyed structures, erected to an engineered rigging plan and handed over plumb, tensioned and documented.
Mount steel, antenna and line installation, hoisting, grounding and the sweep and PIM testing that proves the system before the crew leaves.
Leg, diagonal and foundation reinforcement carried out to a structural engineer's drawings, so a structure can carry a loading it was not built for.
Scheduled structural and lighting inspection, guy tension and plumb, and the photo-documented report with a punch list that a site owner can act on.
Standby generators, automatic transfer switches, fuel systems and shelter HVAC — the systems at the base that decide whether the site stays on air.
Typical spans are planning ranges for a scheduling conversation and assume normal access and workable weather. The span for your site list comes from a written proposal against a defined scope of work. Crew types and rates are on the rates page.
B 0.1 By height
The same five, read by height
A tower job is described by where on the structure it happens. Read top-down, the list is also the argument: the beacon, the mounts, the steel and the compound are one site and, here, one responsible party.
300′ — obstruction lighting
Lamps, photocell, monitoring and the alarm path. A lamp out is a reportable condition, not a maintenance nuisance.
- AGL0–300′
Inspection & Maintenance
Scheduled structural and lighting inspection, guy tension and plumb, and the photo-documented report with a punch list that a site owner can act on.
- AGL60–300′
Antenna & Line Systems
Mount steel, antenna and line installation, hoisting, grounding and the sweep and PIM testing that proves the system before the crew leaves.
- AGL0–300′
Structural Modification
Leg, diagonal and foundation reinforcement carried out to a structural engineer's drawings, so a structure can carry a loading it was not built for.
- AGL0–300′
Tower Construction
New self-support, monopole and guyed structures, erected to an engineered rigging plan and handed over plumb, tensioned and documented.
- AGLGrade
Site Power & HVAC
Standby generators, automatic transfer switches, fuel systems and shelter HVAC — the systems at the base that decide whether the site stays on air.
B 0.2 Before you award
Three pages worth reading before awarding anything
None is long, and each one settles a question that otherwise gets settled in the middle of a job, usually badly and usually over the telephone.
The close-out page matters most. In this trade the document is the product: a crew can do perfect work and still hand you a package your QA process rejects, and the rework costs a mobilisation.
Not sure which scope it is?
Describe the site and what is wrong with it, or what is being added to it. Most of what gets asked for is one of the five above, and several jobs are two of them on one mobilisation.